Hilton progress (floor 40 out of 53)

It looks like the Hilton is now up to 40 floors.

Related posts

  1. Hilton progress (sixth floor complete, 7th almost complete)...
  2. Hilton Height...
  3. Hilton progress (how many floors is it up to?)...
  4. Another week, another floor done at the Hilton...
  5. Hilton progress (above the first floor)...

Related posts brought to you by Yet Another Related Posts Plugin.

10 Responses to “Hilton progress (floor 40 out of 53)”


  1. 1 StEC

    Certainly starting to look impressive! =)

  2. 2 Dan M.

    This building is getting huge! Graham or Drafty, do you have any idea what is being built on the ground floors?

  3. 3 FALLSVIEW

    Convention Center, indoor water theme park, glass blowing studio, shops, and I’ve heard a 1000 seat theatre. This obviously could have changed 30 times by now, but it will be a huge footprint once completed.

  4. 4 Chris

    any date on completion of the interior, because the exterior is basically complete.

  5. 5 Smoke

    How do they get the crane out of the hotel. It takes longer to do the interior then the exterior.

  6. 6 Drafty

    The interior work (drywall, plumbing, electrical, HVAC) can be done on the lower floors while the upper floors are still being constructed, so interior work is really not that far behind the exterior.
    Smoke, check this out: http://forum.skyscraperpage.com/showthread.php?t=152612

  7. 7 Chris

    comment by StEC on “Hilton Height”

    “One of the big shots in the falls needs to go all Dubai on us and build a 100+ story hotel, condo, casino & tourist attraction make it the tallest building in North America!!! =)”

    i think you should check this out…

    http://skyscraperpage.com/diagrams/?cityID=23

  8. 8 Chris

    btw, the numbers on the left are metres.

    some are proposed, so don’t be like “WHOOOOOOOOOOAAAAAAAAA” yet…

  9. 9 Smoke

    Thanks for the info Drafty. This should create a lot of job for the Niagara Economy.

    Is the new Hilton going to have full falls view or is the Casino still going to block the view? It might create cheaper Fallsview Rooms in the older Hilton.

  10. 10 Dan M.

    I saw them unloading bathtubs a week or two ago out of some trucks, so the interior is definately under construction as we speak.