Construction and development update – Part 1 of 2

    20080314_buildabear_01.jpg
    20080314_buildabear_02.jpg
    The outside of the new Build-A-Bear still needs some work, but they are progressing on the inside of the store

    20080314_hilton_01.jpg
    20080314_hilton_02.jpg
    20080314_hilton_03.jpg
    The Hilton from the front and back, as well as the back lot

    20080314_table_rock_01.jpg
    20080314_table_rock_02.jpg
    Table Rock Place is coming along, including the walkway over the Niagara Parkway

    Leave a Reply

    This site uses Akismet to reduce spam. Learn how your comment data is processed.