Update on River Road roadwork

    I posted previously about the work being done on River Road. They were replacing the sewers or water main or something. Well, within the last couple of weeks everything reopened. The road is nicely paved and everything is back to normal.

    A few things to note:

    • Where Falls Avenue and River Road meet was modified. Falls Avenue used to merge onto River Road. Now it is much more like a regular street corner where you have to stop and turn onto the other street.
    • As a result of digging up the road, they also dug up the asphalt sidewalk. It has been replaced as well and has fresh sod down beside it.
    • Last year they started digging up some of the walkway along River Road (Queen Victoria Park) and they are continuing that this year. The walkways used to only be 3-4 feet wide, and are now about 8 feet wide.

    Leave a Reply

    This site uses Akismet to reduce spam. Learn how your comment data is processed.