I don’t post this as any sort of criticism. I can only imagine how hard/costly/time consuming it must be to keep everything working in tip top shape. I just happened to notice this the other day, and figured I’d post about it.
There were lots of lights/signs that need some work on Falls Avenue:
The letters in the Sheraton sign at the top of the hotel are cracked