Hilton progress (sixth floor complete, 7th almost complete)

    The Hilton construction continues. It appears that the sixth floor is done and that the seventh floor is almost done. I don’t know if you can tell by the picture or not, but it appears that the “regular” floors start at the sixth floor. The first 5 floors look to be double-height. I’m sure they will be used for the lobby and meeting space. The sixth and seventh floor look like they are normal height.

    20070111_hilton_progress.jpg

    Leave a Reply

    This site uses Akismet to reduce spam. Learn how your comment data is processed.