{"id":6495,"date":"2009-05-04T14:06:27","date_gmt":"2009-05-04T18:06:27","guid":{"rendered":"http:\/\/accessniagara.com\/blog\/?p=6495"},"modified":"2010-06-05T08:56:45","modified_gmt":"2010-06-05T12:56:45","slug":"npc-brightens-up-the-incline-railway-cars","status":"publish","type":"post","link":"http:\/\/accessniagara.com\/blog\/2009\/05\/04\/npc-brightens-up-the-incline-railway-cars\/","title":{"rendered":"NPC brightens up the Incline railway cars"},"content":{"rendered":"<p>NPC\u00a0 has either replaced the old Incline Railway cars or painted them a fire engine red (they used to be green and yellow). The Niagara Parks Commission is currently developing phase two of their plans to upgrade the Railway to an enclosed, fully accessible service that will be available year-round.<\/p>\n<p style=\"text-align: center;\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" data-attachment-id=\"6501\" data-permalink=\"http:\/\/accessniagara.com\/blog\/2009\/05\/04\/npc-brightens-up-the-incline-railway-cars\/000_01403\/\" data-orig-file=\"https:\/\/i0.wp.com\/accessniagara.com\/blog\/wp-content\/uploads\/2009\/05\/000_01403.jpg?fit=428%2C338\" data-orig-size=\"428,338\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"Incline Railway\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/accessniagara.com\/blog\/wp-content\/uploads\/2009\/05\/000_01403.jpg?fit=428%2C338\" class=\"size-full wp-image-6501 aligncenter\" src=\"https:\/\/i0.wp.com\/accessniagara.com\/blog\/wp-content\/uploads\/2009\/05\/000_01403.jpg?resize=428%2C338\" alt=\"Incline Railway\" width=\"428\" height=\"338\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NPC\u00a0 has either replaced the old Incline Railway cars or painted them a fire engine red (they used to be green and yellow). The Niagara Parks Commission is currently developing phase two of their plans to upgrade the Railway to an enclosed, fully accessible service that will be available year-round.<\/p>\n","protected":false},"author":16,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[16,29],"tags":[1402,255],"class_list":["post-6495","post","type-post","status-publish","format-standard","hentry","category-niagara-falls-attractions","category-niagara-falls-developments","tag-incline-railway-cars","tag-npc"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/6495","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/comments?post=6495"}],"version-history":[{"count":1,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/6495\/revisions"}],"predecessor-version":[{"id":6502,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/6495\/revisions\/6502"}],"wp:attachment":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/media?parent=6495"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/categories?post=6495"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/tags?post=6495"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}