{"id":16008,"date":"2013-03-26T09:00:40","date_gmt":"2013-03-26T13:00:40","guid":{"rendered":"http:\/\/accessniagara.com\/blog\/?p=16008"},"modified":"2013-03-26T05:59:29","modified_gmt":"2013-03-26T09:59:29","slug":"niagara-falls-tunnel-opens","status":"publish","type":"post","link":"http:\/\/accessniagara.com\/blog\/2013\/03\/26\/niagara-falls-tunnel-opens\/","title":{"rendered":"Niagara Falls tunnel opens"},"content":{"rendered":"<p>From <a href=\"http:\/\/www.niagarathisweek.com\/news\/news\/article\/1596224\">Niagara This Week<\/a>:<\/p>\n<blockquote><p>A new hydro tunnel at Niagara Falls officially gushed water Thursday, cranking up electricity production at the Sir Adam Beck Generating Station.<\/p>\n<p>The 10.2-kilometre tunnel, which is 14.4 metres in diameter, was formally feted by energy minister Bob Chiarelli and Tom Mitchell, chief executive of Ontario Power Generation.<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>From Niagara This Week: A new hydro tunnel at Niagara Falls officially gushed water Thursday, cranking up electricity production at the Sir Adam Beck Generating Station. The 10.2-kilometre tunnel, which is 14.4 metres in diameter, was formally feted by energy minister Bob Chiarelli and Tom Mitchell, chief executive of Ontario Power Generation.<\/p>\n","protected":false},"author":6111,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[390,2],"tags":[8737,8738,8739,1970,41,451,2194,5089,5092],"class_list":["post-16008","post","type-post","status-publish","format-standard","hentry","category-niagara-falls-hydroelectric-power","category-niagara-falls-news","tag-bob-chiarelli","tag-electricity-production","tag-energy-minister","tag-generating-station","tag-niagara-falls","tag-niagara-this-week","tag-ontario-power-generation","tag-sir-adam-beck","tag-tom-mitchell"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/16008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/users\/6111"}],"replies":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/comments?post=16008"}],"version-history":[{"count":0,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/16008\/revisions"}],"wp:attachment":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/media?parent=16008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/categories?post=16008"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/tags?post=16008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}