{"id":15783,"date":"2012-12-13T13:00:40","date_gmt":"2012-12-13T18:00:40","guid":{"rendered":"http:\/\/accessniagara.com\/blog\/?p=15783"},"modified":"2012-12-13T13:00:45","modified_gmt":"2012-12-13T18:00:45","slug":"npc-incline-railway-to-get-new-look","status":"publish","type":"post","link":"http:\/\/accessniagara.com\/blog\/2012\/12\/13\/npc-incline-railway-to-get-new-look\/","title":{"rendered":"NPC incline railway to get new look"},"content":{"rendered":"<p>From <a href=\"http:\/\/www.niagarathisweek.com\/news\/news\/article\/1545513\">Niagara This Week<\/a>:<\/p>\n<blockquote><p>Come the spring, the Niagara Parks Commission\u2019s Incline Railway will have a new look.<\/p>\n<p>Construction crews have been busy over the past few weeks dismantling the old system, which has been in service for almost five decades.<\/p>\n<p>\u201cIt will be an all season fully accessible system,\u201d said Marcelo Gruosso. \u201cThe old system had been in operation since 1966. It has done a terrific job, but its time had come.\u201d<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>From Niagara This Week: Come the spring, the Niagara Parks Commission\u2019s Incline Railway will have a new look. Construction crews have been busy over the past few weeks dismantling the old system, which has been in service for almost five decades. \u201cIt will be an all season fully accessible system,\u201d said Marcelo Gruosso. \u201cThe old&#8230;<\/p>\n","protected":false},"author":6111,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[16,2],"tags":[8545,8546,863,8547,99,451],"class_list":["post-15783","post","type-post","status-publish","format-standard","hentry","category-niagara-falls-attractions","category-niagara-falls-news","tag-accessible-system","tag-construction-crews","tag-incline-railway","tag-marcelo-gruosso","tag-niagara-parks-commission","tag-niagara-this-week"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/15783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/users\/6111"}],"replies":[{"embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/comments?post=15783"}],"version-history":[{"count":1,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/15783\/revisions"}],"predecessor-version":[{"id":15784,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/posts\/15783\/revisions\/15784"}],"wp:attachment":[{"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/media?parent=15783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/categories?post=15783"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/accessniagara.com\/blog\/wp-json\/wp\/v2\/tags?post=15783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}