The construction on the addition to the back of Boston Pizza/Sportszone doesn’t look much different on the outside. There must be work going on inside. I mentioned before that Bowlingo had been taken out. They’ve put up a new wall and moved some of the games. The first two pictures show this. The door in the second picture is about where the first Bowlingo lane would have been.

The third picture shows the new room in the area of Boston Pizza by the stairs going down to the Great Canadian Midway.

20090120_bp_construction_01

20090120_bp_construction_02

20090120_bp_construction_03

Related posts

  1. Boston Pizza Clifton Hill patio construction update They sure moved fast in putting the new cover over...
  2. Pictures inside Boston Pizza on Clifton Hill I went into Boston Pizza on Saturday. It looks quite...
  3. Boston Pizza Clifton Hill closed yet again this week As I mentioned in a comment yesterday, the Boston Pizza...

Related posts brought to you by Yet Another Related Posts Plugin.

Tags: , , , , , ,

One Comment to “Changes inside Boston Pizza on Clifton Hill”

  1. Ashley says:

    Hey I can fill you in on some details that is giong on at boston pizza, i work here so we no somewhat whats going on

    they are putting in new bowling alleys (14 i believe) as well as a second bar (what the licence was for) the 3 picture is of new washrooms they are putting in they just finished them today and they are now open. the reasoning behind this is they are sectioning off the bigger bar area and having less entrances inside boston pizza, and the resturant patrons can use the new washrooms

    They will be shutting down March Mon 23 tue 24 wed 25 thur 26 and opening up fri at 5pm till sunday then shutting down the following week the same thing

Leave a Reply

You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>