Beginning of May construction update

This is a smaller construction update than normal, but here are a few pictures:

20080501_bronto.jpg
Bronto’s Adventure Playland looks like it is almost ready

20080501_esm.jpg
They are starting to put the roof on the former Pilgrim Restaurant (future East Side Mario’s?)

20080501_victoria_ave_walkway_01.jpg
20080501_victoria_ave_walkway_02.jpg
The sidewalk along Victoria Avenue used to have large rocks periodically along the edge that you could sit on. They’ve taken them out and put down sod

Related posts

  1. Update to the “Beginning of May construction update”...
  2. East Side Mario’s construction update...
  3. Table Rock Place construction update...
  4. Construction and development update...
  5. Al Macs construction update...

Related posts brought to you by Yet Another Related Posts Plugin.

0 Responses to “Beginning of May construction update”


  1. No Comments
  1. 1 Update to the “Beginning of May construction update” at Niagara Falls Blog
  2. 2 East Side Mario’s construction update at Niagara Falls Blog

Leave a Reply